EP Energy Transition

EP Energy Transition (EPETr) is a Czech energy holding company based in Prague and part of EP Group. It owns LEAG and MIBRAG Energy Group, two German companies operating lignite mines and power stations and developing wind, solar and battery-storage projects.

The current EPETr structure dates from a 2023 reorganisation of EP Group's German coal businesses. The company is involved in projects intended to replace the existing coal-fired generation as Germany phases out lignite.

History

The company was incorporated in 2021 as Mirtheaven a.s.. It was renamed LEAG Innovative Energy a.s. in January 2023 and adopted the name EP Energy Transition in October that year.

In 2023, EP Group began transferring its German lignite interests from EPH to EPETr. EPETr acquired a 20% stake in LEAG from and EPH later transferred its 50% stake, bringing EPETr's holding in LEAG to 70%.

In March 2025, EPETr bought PPF's remaining 30% stake and became the sole owner of LEAG.

EPH transferred MIBRAG Energy Group to EPETr in October 2025.

Renewable energy

LEAG acquired the renewable-energy project developer EP New Energies in 2024 and renamed it LEAG Renewables. The company develops wind and solar projects for LEAG, MIBRAG and other customers. In September 2026, LEAG commissioned the 105 MW Forst-Briesnig II wind farm and the first phase of the Bohrau solar park. Both were built on reclaimed land at the former Jänschwalde mine.

MIBRAG operates the Peres West I and II solar parks, with capacities of 43 MWp and 37 MWp respectively. The company is also building the Breunsdorf and Profen II wind farms on former mining land. With planned capacities of 93 MW and 62 MW, both are scheduled to enter operation in 2027.

Battery storage

LEAG began construction of the GigaBattery Jänschwalde 1000 in September 2026. The battery will have a power capacity of 1 GW and a storage capacity of 4 GWh, with commissioning planned for 2028. Construction of a further 400 MWh battery at Heinersbrück began in August 2026. Scheduled for completion in 2027, it will share a grid connection with wind and solar generation.

See also

  • EP Group
  • Energetický a průmyslový holding
  • LEAG